Which of the following is represented by C in the following figure?

Options

A : a. Outlet

B : b. Digestion chamber

C : c. Gas chamber

D : d. Sedimentation chamber

In which of the following, the settling of solids takes place in the following figure?

Options

A : a. Outlet

B : b. Digestion chamber

C : c. Gas chamber

D : d. Sedimentation chamber

The maximum flow through the period at D in the following figure?

Options

A : a. 0.3m/min

B : b. 0.4m/min

C : c. 0.8m/min

D : d. 0.9m/min

The sludge is digested in which of the following?

Options

A : a. Outlet

B : b. Sedimentation chamber

C : c. Gas chamber

D : d. Digestion chamber

The gas chamber in the below figure is represented by _____________

Options

A : a. A

B : b. E

C : c. B

D : d. C

The sewage comes in the Imhoff tank through which of the following?

Options

A : a. A

B : b. B

C : c. C

D : d. D

The detention period of the sedimentation chamber of an Imhoff tank is?

Options

A : a. 30 seconds

B : b. 30 minute

C : c. 1 hour

D : d. 2 hours

B in the following figure is represented by ____________

Options

A : a. Outlet

B : b. Sedimentation chamber

C : c. Gas chamber

D : d. Digestion chamber

Which of the following is called a scum chamber in the following figure?

Options

A : a. Settling chamber

B : b. Sedimentation chamber

C : c. Gas chamber

D : d. Digestion chamber

Which of the following is an anaerobic process for treating sewage?

Options

A : a. Oxidation pond

B : b. Imhoff tank

C : c. Oxidation ditch

D : d. Rotating Biological Contactors

The minimum design depth of oxidation pond is ___________

Options

A : a. 0.3m

B : b. 0.5m

C : c. 1m

D : d. 1.5m

Oxidation pond is ineffective in removing pathogenic bacteria.

Options

A : a. True

B : b. False

C : c. May be True or False

D : d. Can't say

The detention period of oxidation pond is ___________

Options

A : a. 12-36 hours

B : b. 4 hours

C : c. 10-20 days

D : d. 30-60 seconds

The maximum BOD removal efficiency of an oxidation pond is ___________

Options

A : a. 90%

B : b. 68%

C : c. 70%

D : d. 80%

What is the minimum depth of water to be kept in the oxidation pond?

Options

A : a. 0.3m

B : b. 0.5m

C : c. 1m

D : d. 1.5m

Which chemical is added to the oxidation pond to avoid bad odor?

Options

A : a. Calcium chloride

B : b. Sodium nitrate

C : c. Potassium chloride

D : d. Silver nitrate

The disposal of sewage from the septic tank is done by which of the following?

Options

A : a. Clarifier

B : b. Soak pit

C : c. Aerated lagoon

D : d. Lamp holes

The detention period of a septic tank is ___________

Options

A : a. 2 hours

B : b. 12-36 hours

C : c. 4 hours

D : d. 1 week

The concentration of biodegradable organic matter after the septic tank is ___________

Options

A : a. 50ppm

B : b. 100ppm

C : c. 200ppm

D : d. 75ppm

What is the maximum design flow of sewage in a septic tank?

Options

A : a. 70 liters per person per day

B : b. 100 liters per person per day

C : c. 30 liters per person per day

D : d. 40 liters per person per day