1. Follow-up prescribes the sequence of operations to be followed.

Options

A : Correct

B : Incorrect

C :

D :

2. For material transportation, conveyors are used when the prevailing conditions include

Options

A : loads are uniform

B : routes do not vary

C : materials move relatively continuously

D : all of these

4. The purpose of micromotion study is to

Options

A : assist in finding out the most efficient way of doing work

B : train the individual operator regarding the motion economy principles

C : help in collecting the motion time data for synthetic time standards

D : all of the above

5. Slack represents the difference between the

Options

A : earliest completion time and latest allowable time

B : latest allowable time and earliest completion time

C : earliest completion time and normal expected time

D : latest allowable time and normal allowable time

6. The factors to be considered for production scheduling are

Options

A : component design

B : route sheet

C : time standards

D : all of these

7. In Emerson's efficiency plan of wage incentive system, bonus is paid to a worker

Options

A : whose output exceeds 67% efficiency

B : on the percentage of time saved

C : on the percentage of time worked

D : on the percentage of standard time

8. The product layout

Options

A : lowers overall manufacturing time

B : requires less space for placing machines

C : utilises machine and labour better

D : all of these

9. Merit rating is the method of determining the

Options

A : relative values of a job

B : worker's performance on a job

C : worth of a machine

D : value of overall production

10. PERT stands for

Options

A : Programme Estimation and Reporting Technique

B : Process Estimation and Review Technique

C : Programme Evaluation and Review Technique

D : Planning Estimation and Resulting Technique

1. When slack of an activity is zero, the activity is critical and any delay in its performance will delay the completion of the whole project.

Options

A : Yes

B : No

C :

D :

2. The main objective of work measurement is to

Options

A : plan and schedule of production

B : formulate a proper incentive scheme

C : estimate the selling prices and delivery dates

D : all of the above

3. Critical path method

Options

A : helps in ascertaining time schedules

B : makes better and detailed planning possible

C : provides a standard method for communicating project plans schedules and to time and cost performance

D : all of the above

4. The bonus increases in proportion to the increase in efficiency. This statement applies to

Options

A : Halsey plan

B : Ganttplan

C : Emerson's efficiency plan

D : Rowan plan

5. A-B-C analysis

Options

A : is a basic technique of materials management

B : is meant for relative inventory control

C : does not depend upon the unit cost of the item but on its annual consumption

D : all of the above

6. Both Rowan plan and 50-50 Halsey plan will provide the same earning when the actual time is __________ the standard time.

Options

A : one-fourth

B : one-half

C : equal to

D : twice

7. The work study is done by means of

Options

A : planning chart

B : process chart

C : stop watch

D : any one of these

8. According to Rowan plan of wage incentive system, bonus is paid to a worker

Options

A : whose output exceeds 67% efficiency

B : on the percentage of time saved

C : on the percentage of time worked

D : on the percentage of standard time

9. Indirect expenses include

Options

A : factory expenses

B : selling expenses

C : administrative expenses

D : all of these

10. In perpetual inventory control, the material is checked as it reaches its

Options

A : maximum value

B : minimum value

C : average value

D : any one of these

1. Which of the following conditions are necessary for applying linear programming?

Options

A : These must be a well defined objective function.

B : The decision variables should be interrelated and non-negative.

C : The resources must be in limited supply.

D : all of the above